Keys to the Site:

  • Views
  • Slope
  • spring snow run off
  • driveway placement summer and winter use snow plowing. snow storage as well

Home designing keys

  • snow loading in front of entry doors and garage doors.
  • ice damming on roof
  • passive solar to help heat

Pre construction process

  • Soils test, must be completed to engineer the structure
  • design home plans
  • engineering plans to comply with local building codes
  • permits, including sing offs from Environmental Health, Fire Marshall, All Utilities, Road and Bridge, and Planning.

Now that you have everything ready this is what you job might look like.

1. Bids and estimates choosing the right subcontractor is always key



2. Road excavation

3. Excavation



4. Foundation and rough plumbing


5. Waterproofing and drain tile


6. Back Fill


7. Framing


8. Rough subs


9. Insulation and Drywall


10. Windows and Doors



11. Interior Finishes